Membrane structure of the daily use of the process often may exist in the course of the problem: the small fault is not timely treatment will become a big fault, the big fault will become a large maintenance project, the cost of the resulting from a small cost into a large cost, it may become difficult to solve the problem, and lead to the entire membrane structure engineering paralysis.
Membrane structure Sports grandstand maintenance, basically because of the installation quality or affected by the use of the environment, in the course of use will inevitably arise some problems and need us to adjust, do not because the problem is small and neglect them. In order to ensure the safety of the membrane structure, more reliable use of the owners in the daily needs of the membrane structure of the sports stand building to carry out the necessary regular maintenance work.
The daily heavy rain, should be on the membrane to overhaul, to see if there are other debris accumulation, timely clearance to keep the membrane clean, membrane surface has slack or stagnant water phenomenon, to find professionals to deal with the adjustment in time. If the bolt screw of the skeleton structure is loose, it should be strengthened immediately.