The implementation of membrane structure engineering is actually very complex, and many details need to be considered and matters needing attention. First of all, membrane structure engineering needs to prepare a detailed before implementation, including: Drawing design, practical engineering, user characteristics of the needs of comprehensive consideration. The installation of membrane structure construction is very important, especially to ensure the safety of membrane structure engineering, so that the membrane structure can be effectively guaranteed to bring great convenience to our life. What should be noticed in the process of membrane structure engineering?
From the angle of the design of the membrane structure, membrane structure of the whole process of the construction, but also should shape design, component design, detail design, connection design, cutting design and construction process of each step is very important, need staff careful operation, so as to ensure that the normal implementation of membrane structure engineering. In fact, the early design is very important, especially the feasibility of membrane structure engineering implementation, design costs, need to be carefully studied and considered to ensure the normal implementation of the project.
Precautions for membrane structure engineering:
1, Must ensure that the same line boundary work point, for other rigid boundary, because the component itself has a certain size of space according to the actual situation to change the film working point or keep the film working point unchanged, change the connection components practice, but overall the latter more difficult. In real life, the most commonly used is a practice, changing the film's working point is the most used, the effect is very good.
2, Longitude and latitude to determine the layout between the membrane and the location of the diaphragm seam, longitude film decoration affects more, membrane material utilization, production work, and so on, must conform to the calculation model. Field splicing seam processing is not easy to leak, so generally in the field of ridge joints more appropriate. In the field splicing, must pay attention to the details, to ensure that the membrane structure works will not leak, this is to enhance the user experience must do the work. The other is in the membrane structure works after a period of time, there are professional maintenance work, so can greatly prolong the service life of the membrane structure.
3, The membrane material and the hard boundary connection point, should consider the special compensation value, in order to facilitate the installation.
4, The width of the membrane for the full use of membrane materials, taking into account the boundary lap length, prestress expansion and other factors to compensate the boundary, reduce the diaphragm will attempt to approach the width of the membrane material to improve the utilization of membrane materials. Really good membrane material price is very high, so if we can greatly improve the membrane material utilization, will greatly save the user's cost of use.