Membrane Structure Engineering Construction How To Accept The Qualified

2018-09-28

Membrane Structure engineering Acceptance is a key, the owners do not recognize our project is also this step, membrane structure engineering basic operation to achieve the following standards, each project acceptance is confirmed by the person after the signature qualified workers can formally leave the tool off the field, the main acceptance of the following several jobs.

membrane structure,tensile fabric structure,canopy,steel structure,roof canopy

1. All the information of the whole project to be submitted complete, all the information must be a two copies, each project we have their own database archive for after-sales maintenance work, each need both sides of the information to be approved by the relevant responsible person signed.

2. Membrane structure construction site must be done Sanko, steel structure surface paint must have luster, steel members shall not appear the phenomenon of potholes, the film surface must be smooth and flat shall not exist stains or residues, construction site all garbage and other construction caused by the accumulation must be clean, not leave any rubbish.

3. It is necessary to ensure that the membrane structure works can be used normally, especially if the drainage system of membrane structure building can be drained normally, and whether the drainage measures are done, the owner should invite the owners to carry out inspection and acceptance drainage in person, so that the performance of later use will not be affected.